This document explains SAP Production Planing (PP) MRP Configuration in step by step manner with the help of system screenshots.
This document is very useful for all SAP Production Planing (PP) consultant and or who are having aspiration to be PP consultant. This document helps you to understand sap Production Planing (PP) MRP configuration in systematic manner and you need not to waste your time in SPRO for Production Planing (PP) configuration.
ou can use this document for learning and implementing projects. If you are going to attend SAP certification examination, this document may help you to understand the concept of Production Planing (PP) MRP and configuration option available for the same.
This document covers following aspects of configuration in detail manner,
Activating MRP and Planning file entries
Lot sizing procedure and rounding off profile
Maintain MRP Group
MRP – Plant Parameter – detailed scheduling
MRP Group
MRP Plant parameter – Available stock
MRP Plant Parameter – Conversion
MRP Plant Parameter – Dependant Availability chek rule
MRP Plant Parameter – Float
MRP Plant Parameter – MRP Controller
MRP Plant Parameter – Number Ranges
MRP Plant Parameter – Planning horizon
MRP Plant Parameter – Rescheduling
MRP Plant Parameter – Special Procurement Key
MRP Plant Parameters – Backorder processing checking rule
MRP type
MRP-Plant parameter – BOM/routing selection
Planning Strategy
Plant parameters
Requirement Class (PP)
Requirement Class (SD)
Requirement Type (PP)
Scope of planning
Strategy Group
List All Documents |
|
|
Advanced Search |
|
| Download Area | |
| Show Download Cart | |
|
Your Download Cart is currently empty.
|