SB10001310

SAP MM MRP End User Documents

SAP MM MRP End User Documents explain in step by step manner with screenshots, how to do transaction in SAP MM MRP. SAP MM MRP End User Documents can be used for power user training or end user training in the final preparation phase during implementation. These documents help you to understand how to run transactions in SAP and complete your business process. These documents are very helpful for the entire sap user even if they are new to SAP screens.

SAP MM MRP End User Documents will provide the complete explanation for individual sap transaction like

1. Business / Functional use and explanation of SAP T code
2. Prerequisite to run this T code
3. Menu Path for such T Code
4. Step by Step with screenshots how to run this transaction
5. Complete guide explanation for input value to be entered to run these transactions.
6. Expected Results from these transaction
7. One Individual Document for individual transaction
In this document set we cover following transactions
Demand Management

  • MC75 – Tranfer Active Planto DM MRP
  • MD04 – Stock Requirements List MRP
  • MD07 – Stock Requirements List Collective MRP
  • MD61 – Create PIR MRP
  • MD63 – Display PIR MRP
  • MD67 – Staggered Period Split MRP
  • MD74 – Reorganize PIR MRP
  • MD81 – Create Customer Requirements MRP

Long Term planning (LTP)

  • CM38 – Analyze Capacity Requirements-LTP

LTP-Flow

  • CM38 – Analyze Capacity Requirements-LTP
  • KSPP – Transfer activity details to Controlling
  • MCB& – Copy Simulative Stock to InvControlling
  • MCEC – LTP Material Analysis
  • MS70 – Exporting to Purchasing InfoSystem
  • MS01 – Total Planning On-lineLTP
  • MS02 – Single Item Multi-level – LTP
  • MS04 – LTP Stock Requirements List
  • MS64 – LTP Independent Requirementscopying
  • MSBT – Total Planning in Background for LTP
  • MC32 – LTP Scenario change
  • MS31 – LTP Scenariocreation

Master Production Schedule (MPS)

  • MD40 – MPS On line
  • MD41 – MPS single item Multi Level
  • MDBS – MPS Total Planning Background

Material Requirements Planning (MRP)

  • MD01 – Online Planning Run
  • MD02 – Single Item MultiLevel MRP
  • MD43 – single item Interactive Planning MRP
  • MDBT – Total Planning – Background

MRP Evaluation

  • CO24 – Missing Parts Info system
  • MD05 – MRP List Evaluation
  • MD06 – MRP List Evaluations Collective
  • MD44 – Planning evaluation for a material
  • MDVP – Availability Check

Planning

  • MF50 – Planned Order creation
  • MF50 – Planning Table Change
  • MF51 – Production List Repmfg
  • MMBE – Stock over View

Leave a Reply