SAP MRP Production Planning Configuration Document

SAP MRP Production Planning Configuration Document

SAP MRP Production Planning Configuration Document explains SAP MM MRP Configuration in step by step manner with the help of system screenshots

SAP MRP Production Planning Configuration Document  is very useful for all SAP MM consultant and or who are having aspiration to be MM consultant This document helps you to understand sap Material Management (MM) Material Requirement planning configuration in systematic manner and you need not to waste your time in SPRO for MM MRP configuration

You can use this document for learning and implementing projects If you are going to attend SAP certification examination, this document may help you to understand the concept of SAP MM MRP and configuration option available for the same

SAP MRP Production Planning Configuration Document covers following aspects of configuration in detail manner,

Activating MRP and planning file entries
Lot sizing procedure and rounding off profile
Maintain MRP Group scheduling /doctype
MRP Plant parameter Available stock
MRP Plant parameter BOM/routing selection
MRP Plant Parameter Conversion
MRP Plant Parameter Dependant Availability check rule
MRP Plant Parameter detailed scheduling
MRP Plant Parameter Float (Schedule Margin Key)
MRP Plant Parameter MRP Controller
MRP Plant Parameter Number Ranges
MRP Plant Parameter Planning horizon
MRP Plant Parameter Rescheduling
MRP Plant Parameter Special Procurement Key
MRP Plant Parameters Backorder processing checking rule
Number Ranges for Manual Processing
Number Ranges for Planning run
Planning Strategy
Requirement Class (PP)
Requirement Class (Sales and Distribution)
Requirement Type (PP)

Leave a Reply

Your email address will not be published. Required fields are marked *